Portfolio

Our recent work

Real projects with photos and details — each links to our Facebook post.

Lifting & Re-Leveling the Aircraft Apron at Don Mueang Airport with Polyurethane URETEK Resin

Lifting & Re-Leveling the Aircraft Apron at Don Mueang Airport with Polyurethane

● Don Mueang Airport

The concrete aircraft apron at Don Mueang Airport had settled and become uneven. URETEK lifted and re-leveled it by polyurethane injection with precise laser control — working point by point around the parking stands, with minimal impact on flight operations and fast reopening.

 Industrial Factory Floor Lifting & Soil Stabilization with Polyurethane — Without Halting Production URETEK Resin

Industrial Factory Floor Lifting & Soil Stabilization with Polyurethane — Without Halting Production

● Industrial factories (various sites)

URETEK lifts floors and stabilizes soil across a range of industrial factories — from beneath heavy machinery and raw-material stores to production-line floors — using point-by-point polyurethane injection that is fast and requires no production shutdown.

Road Subsidence & Under-Road Void Filling on Ratchaphruek with Polyurethane, Overnight URETEK Resin

Road Subsidence & Under-Road Void Filling on Ratchaphruek with Polyurethane, Overnight

● Ratchaphruek Road, near The Crystal

The road surface on Ratchaphruek near The Crystal had subsided due to voids beneath it. URETEK filled the voids and stabilized the sub-base by polyurethane injection — working overnight on this arterial road, testing the soil with DCP, and reopening the road to traffic by the next morning.

Floor Lifting Beneath Stainless Water Tanks, Betagro Khon Kaen — No Tanks Moved URETEK Resin

Floor Lifting Beneath Stainless Water Tanks, Betagro Khon Kaen — No Tanks Moved

● Betagro, Khon Kaen

The concrete floor beneath the stainless steel water/treatment tanks in the utility building at Betagro Khon Kaen had settled. URETEK lifted and re-leveled it by polyurethane injection, controlled with an optical level — without moving the tanks or shutting down the system.

Ground Engineering for a High-Speed Rail Project with Polyurethane Technology URETEK Resin

Ground Engineering for a High-Speed Rail Project with Polyurethane Technology

● High-Speed Rail Project (China Railway)

URETEK was engaged to assess and advise on ground engineering for a high-speed rail project, working alongside the main contractor's engineering team — presenting polyurethane injection technology for soil stabilization and the stability of large-scale infrastructure.

Warehouse Floor Lifting at LF Logistics Bangphli with Polyurethane — No Racking Moved URETEK Resin

Warehouse Floor Lifting at LF Logistics Bangphli with Polyurethane — No Racking Moved

● LF Logistics, Bangphli

The concrete floor at the LF Logistics Bangphli warehouse had settled beneath the tall storage racking. URETEK lifted and re-leveled it with polyurethane injection — working under the racking without moving goods or dismantling the racks, using clean-containment tents — while the warehouse kept operating.

Soil Stabilization Beneath the Samrong Tai Pumping Station with Polyurethane — No Service Interruption URETEK Resin

Soil Stabilization Beneath the Samrong Tai Pumping Station with Polyurethane — No Service Interruption

● Samrong Tai Pumping Station

The concrete apron around the Samrong Tai pumping station had settled as the underlying soil weakened. URETEK stabilized the soil and filled the voids by polyurethane injection — with a survey grid, laser control, before/after DCP soil testing, and pressure logged at every point — working overnight without interrupting the water supply.

Resort Building Underpinning, Pearl's Land Resort Suphanburi, with Micropiles URETEK Micropile

Resort Building Underpinning, Pearl's Land Resort Suphanburi, with Micropiles

● Pearl's Land Resort, Suphanburi

A resort accommodation building in Suphanburi had settled and cracked. URETEK underpinned it with micropiles jacked to firm strata — working point by point with compact equipment to stop the settlement while minimising disruption to guests.

Settled Lowland Home, Hathairat–Khlong Sam Wa — Comprehensive Micropile Underpinning URETEK Micropile

Settled Lowland Home, Hathairat–Khlong Sam Wa — Comprehensive Micropile Underpinning

● Hathairat, Khlong Sam Wa, Bangkok

A home in the low-lying, soft-clay area of Khlong Sam Wa had settled at multiple points. URETEK installed micropiles throughout the interior at every column and footing position — including raking piles where needed — jacked to firm strata to stop the settlement across the whole house.