2-Storey House Settlement, Mahachai — 27 m Micropiles, Every Pile Logged URETEK Micropile

2-Storey House Settlement, Mahachai — 27 m Micropiles, Every Pile Logged

● Mahachai, Samut Sakhon

A 2-storey detached home in Mahachai had settled on soft coastal clay. URETEK underpinned it with micropiles jacked 26–27 m down to firm strata — logging the pressure and millimetre-precise lift of every pile for full traceability.

Highway & Expressway Subsidence Repair — Under-Road Void Filling with Polyurethane, Overnight URETEK Resin

Highway & Expressway Subsidence Repair — Under-Road Void Filling with Polyurethane, Overnight

● A highway / expressway

A settled highway/expressway surface caused by voids and weak soil beneath the pavement. URETEK filled the voids and stabilized the ground by polyurethane injection — working overnight with standard traffic-lane control, no resurfacing, and fast reopening. Body (TH)

Fixing a Settled Bridge Approach — Under-Slab Void Filling with Polyurethane, Overnight, No Closure URETEK Resin

Fixing a Settled Bridge Approach — Under-Slab Void Filling with Polyurethane, Overnight, No Closure

● Bridge approach (an elevated road)

The bridge approach — the joint where the bridge meets the road — had settled, creating a step and a bump as vehicles passed. URETEK filled the voids and stabilized the soil beneath the approach slab by polyurethane injection, working overnight with no bridge closure and no resurfacing.

Overnight Aircraft-Apron Lifting at Chiang Mai Airport with Polyurethane URETEK Resin

Overnight Aircraft-Apron Lifting at Chiang Mai Airport with Polyurethane

● Overnight Aircraft-Apron Lifting at Chiang Mai Airport with Polyurethane

The settled, uneven aircraft apron at Chiang Mai Airport was lifted and re-leveled by URETEK with polyurethane injection — working overnight airside under strict airport safety coordination, and returning the stands ready for use before the first morning flights.

Lifting & Re-Leveling the Aircraft Apron at Don Mueang Airport with Polyurethane URETEK Resin

Lifting & Re-Leveling the Aircraft Apron at Don Mueang Airport with Polyurethane

● Don Mueang Airport

The concrete aircraft apron at Don Mueang Airport had settled and become uneven. URETEK lifted and re-leveled it by polyurethane injection with precise laser control — working point by point around the parking stands, with minimal impact on flight operations and fast reopening.

 Industrial Factory Floor Lifting & Soil Stabilization with Polyurethane — Without Halting Production URETEK Resin

Industrial Factory Floor Lifting & Soil Stabilization with Polyurethane — Without Halting Production

● Industrial factories (various sites)

URETEK lifts floors and stabilizes soil across a range of industrial factories — from beneath heavy machinery and raw-material stores to production-line floors — using point-by-point polyurethane injection that is fast and requires no production shutdown.

Road Subsidence & Under-Road Void Filling on Ratchaphruek with Polyurethane, Overnight URETEK Resin

Road Subsidence & Under-Road Void Filling on Ratchaphruek with Polyurethane, Overnight

● Ratchaphruek Road, near The Crystal

The road surface on Ratchaphruek near The Crystal had subsided due to voids beneath it. URETEK filled the voids and stabilized the sub-base by polyurethane injection — working overnight on this arterial road, testing the soil with DCP, and reopening the road to traffic by the next morning.

Floor Lifting Beneath Stainless Water Tanks, Betagro Khon Kaen — No Tanks Moved URETEK Resin

Floor Lifting Beneath Stainless Water Tanks, Betagro Khon Kaen — No Tanks Moved

● Betagro, Khon Kaen

The concrete floor beneath the stainless steel water/treatment tanks in the utility building at Betagro Khon Kaen had settled. URETEK lifted and re-leveled it by polyurethane injection, controlled with an optical level — without moving the tanks or shutting down the system.

Ground Engineering for a High-Speed Rail Project with Polyurethane Technology URETEK Resin

Ground Engineering for a High-Speed Rail Project with Polyurethane Technology

● High-Speed Rail Project (China Railway)

URETEK was engaged to assess and advise on ground engineering for a high-speed rail project, working alongside the main contractor's engineering team — presenting polyurethane injection technology for soil stabilization and the stability of large-scale infrastructure.