Portfolio

Our recent work

Real projects with photos and details — each links to our Facebook post.

Soil Stabilization Beneath the Samrong Tai Pumping Station with Polyurethane — No Service Interruption URETEK Resin

Soil Stabilization Beneath the Samrong Tai Pumping Station with Polyurethane — No Service Interruption

● Samrong Tai Pumping Station

The concrete apron around the Samrong Tai pumping station had settled as the underlying soil weakened. URETEK stabilized the soil and filled the voids by polyurethane injection — with a survey grid, laser control, before/after DCP soil testing, and pressure logged at every point — working overnight without interrupting the water supply.

Settled Floor — No Demolition! Resin Lifting, Ratchaphruek URETEK Resin

Settled Floor — No Demolition! Resin Lifting, Ratchaphruek

● Sarin Ratchaphruek, Phutthamonthon Sai 1 ● 0 ● 0

A settled granito driveway with split joints — without the cost and downtime of tearing it out. URETEK lifted and re-leveled it with laser-controlled polyurethane resin injection. Fast, clean, ready to use the same day.

PU Void Filling to Prevent Settlement — Bangkok Bank, Rama 3 URETEK Resin

PU Void Filling to Prevent Settlement — Bangkok Bank, Rama 3

● Rama 3, Bangkok ● - ตรม. ● - วัน

Voids had formed beneath the slab around a gas control station at Bangkok Bank's Rama 3 branch. URETEK injected expanding polyurethane to fill the voids under the slab and stop further settlement — with no excavation, no disruption to the live gas system, and clean overnight work.